Groundwater remediation – the removal of trace contaminants of concern from groundwater – is often the result of failed litigation. This application requires the temporary supply of a treatment train on a lease basis. As a result, both the capital and operating costs of a treatment system are significantly reduced.
Furthermore, the onsite generation of the oxygen molecule is required to help sustain an in-situ biomass. Onsite oxygen generation also assists in the production of the ozone.
Often, the treatment trains are in remote locations. PCI offers remote diagnostics and alarms to contact appropriate personnel and send them to site if maintenance is required.
MODEL | DESCRIPTION | FLOW | PRESSURE | PURITY |
---|---|---|---|---|
DOCS 80 | 208V / 3-Phase / 60Hz or 220V / 3-Phase / 50Hz | 80 lpm | 20-100 psig | 93% +/- 3% |
DOCS 200 | 460V / 3-Phase / 60Hz or 380V / 3-Phase / 50Hz | 200 lpm | 20-100 psig | 93% +/- 3% |
DOCS 500 | 460V / 3-Phase / 60Hz or 380V / 3-Phase / 50Hz | 500 lpm | 20-100 psig | 93% +/- 3% |
DOCS 1500 | 460V / 3-Phase / 60Hz or 380V / 3-Phase / 50Hz | 1500 lpm | 3-12 psig | 93% +/- 3% |
DOCS 1500 Booster | 460V / 3-Phase / 60Hz or 380V / 3-Phase / 50Hz | 1500 lpm | 20-100 psig | 93% +/- 3% |
DOCS 5000 | 460V / 3-Phase / 60Hz or 380V / 3-Phase / 50Hz | 5000 lpm | 3-12 psig | 93% +/- 3% |
DOCS 5000 Booster | 460V / 3-Phase / 60Hz or 380V / 3-Phase / 50Hz | 5000 lpm | 20-100 psig | 93% +/- 3% |